Recommendation of the tender
A pre-treatment that has been approved by GSB International and an approved coating material must be used for the coating of components.
The coating must be in accordance with the current version of GSB AL 631. The company performing the work is a certified member of GSB International. When carrying out the work, a Factory Production Control (FPC) in accordance with GSB AL 631 must be performed.
Quality samples and test reports — which, as well as the project description, provide information on all significant properties of the coating — must be produced with the coating. It is advisable to specify and approve for implementation the requested colours, the colour uniformity and the uniform surface finish (gloss and structure) of all components using quality and/or limit value samples. The test protocols and test sheets must be stored by the coater for the duration of the agreed warranty.
Coating company requirements
Quality label:
Download recommendation text (DOC)
The specification text is a recommendation. Any statements, data and recommendations are based on the latest technical developments, without guarantee and assumption of liability.
The configuration and composition of the summary seal is solely the responsibility of the user. GSB INTERNATIONAL accepts no responsibility for errors made by the user.
The GSB summary seal is reserved exclusively for authorized coating companies. The seal can not be used misleadingly.
Only certified companies have the right to use the GSB summation seal.
Further information info@gsb-international.de